Wednesday, October 10, 2018

Getting Hardy Ready

90 degree days last week and lows forecast to be in the 30's Friday night. We have received much needed rain, around 7" over the past 10 days. Our pond is still about 9" from overflowing.

This morning I joined 3 other guys doing some work at the church. Two of them taped the 30'x27' high wall where we hung the drywall recently. I replaced some damaged ceiling tiles, hauled some trash out to the dumpster and help with some of the preparation work required before we cut a hole in the exterior wall to install a new exit door.

Yesterday I pulled the doors off the Hardy and removed the old seals.The old seals came out without to much problem. The seal on the ash door didn't seem to be bad but the seal on the main door was shot.
 
Below is a photo of the doors with the new rope seals in place.

The doors are now back on the Hardy. I will probably fire it up tomorrow just to make sure everything is working OK.

God is good, may He bless you and yours.

No comments:

Post a Comment