We had a great turnout Tuesday evening.
A before photo of the wall behind the stage.
Getting things covered up to protect them from dust.
The drywall has been removed from the backside of the wall, and the 6" batt insulation has been removed and bagged.
The wall is gone.
Wednesday afternoon the remainder of the metal studs were installed in the wall between us and the main warehouse.
Kenny fastening studs to base track.
Steve screwing the first piece of wallboard to the studs, with Jerry doing Quality Control.
I didn't take a photo of the progress when I left at 5:30, but all the drywall was up on this side of the wall except the top 4'. Those pieces were going to require a lot of cutting and fitting around purlins, pipes, etc. More people were coming in at 6 to continue the work.
It sure is exciting to be part of such a vibrant worship community.
God is good, may He bless you and yours.